Cladding Repairs to Ral 5003 in Lowestoft.

A vast majority of the cladding panels in these two elevations had been badly damaged by ground workers at low level. MPJ Coatings were asked to repair and re-coat these panels as a matter of urgency.  Time was of the essence with this job as the handover of the building was imminent.  We completed the work…